Forum Replies Created

Viewing 0 reply threads
  • Author
    Posts
    • #428796
      George
      Participant

      Early in schematic design, I learned that cost instability usually comes from assumptions that are never technically tested. While shaping budgets on similar projects, I focused on evaluating structural systems, envelope concepts, and mechanical strategies against realistic construction methods and sequencing. Using an approach aligned with David Fields Consulting Services experience, I reviewed assemblies for material efficiency, installation complexity, and procurement risk before design decisions were locked. This type of technical evaluation allowed me to validate cost drivers early, adjust scope intelligently, and move forward with far more reliable cost certainty as the design progressed.

Viewing 0 reply threads